It is crucial to abide by standard procedures when installing or demolishing electrical lines or systems. Use the Electrical Installation and Demolition Checklist for both underground and aboveground inspections prior to any electrical work to ensure electrical safety. Use the GPS feature to record where each inspection takes place and make sure each evaluation is approved and signed off by both the contractor and the installation or demolition representative. Customize this form to accommodate the specific needs of your inspection guidelines.

Electrical Installation and Demolition Checklist iPhone, iPad Electrical Installation and Demolition Checklist Android Electrical Installation and Demolition Checklist Web, Desktop
Electrical Installation and Demolition Checklist

Site inspected

Name of area or location this audit covers

Date

Location

Has the working area to be signed off for demolition been toughly inspected?

What methods of testing were employed to perform this testing? Please List methods employed.

Underground excavation works

In the areas where excavation is to be carried out, are there any risks in finding any live cables or others services below the area to be excavated despite the testing already undertaken and completed?

If any cables, conduits or other services are discovered. What action should be taken?

Has the demolition company been made aware of risks in finding additional cables and conduits under the area to be excavated for demolition?

Above ground demolition works

If the area to be demolished has a ceiling in place any electrical services above that ceiling line are to be considered live and must not be touched or disturbed.. Has this been explained to builder and Demolisher?

Have all visible and accessible cables that remain in the areas to be demolished been labeled with temporary construction tape?

Confirmation of instructions

Has the Demolisher been made aware of the risks of finding live electrical cables in the rooms to be demolished?

Has the builder been notified of the associated risks with demolition works in the areas to be undertaken?

Has the Demolisher been notified of the associated risks with demolition works in the areas to be undertaken?

Has the Builder and Demolition Works contractor been made aware that all Electrical Cables are to be considered "Live" at all times. If there is any doubt, that a cable maybe live the Demolisher must contact the builder and notify their concerns.

Sign-off

Contractor Representative Signature

Builder Representative Signature

Demolisher Representative Signature