Owen Electric Cooperative: Accelerating pole inspection workflows with Fulcrum
"Before we were spending about three minutes per pole inspection. With Fulcrum, it takes 30 to 45 seconds — a time savings of at least 75% per pole."
Greg Humphries, Engineering Project Supervisor
Owen Electric Cooperative

GeoForce outshines the competition with Fulcrum
“Using Fulcrum, we’re able to get ahead of the other crews and return data to our clients much faster.”
Brian Stroud, Vice President and GIS Developer
GeoForce Utility Technologies

Performing electrical distribution inspections and mapping with Fulcrum
The introduction of the iPads to the field inspectors has had a dramatic impact on the business. Inspectors can plan their routes better with a map representation of all pillars to be inspected. We're now able to visit all pillars in a patrol. Missed pillars are a thing of the past which has improved the overall safety, and we're doing more work with fewer people.
Northpower

Digital defensible space inspections for wildfire prevention
“It really made it so maybe you were able to do three inspections a day and now you can do 20 inspections a day. A lot of that just comes from the simplification of the inspection form and the default auto-population. It really saved a lot of time for the inspectors out in the field.”
Matt Marsh, GIS Analyst
Santa Barbara County Fire Department

Southern California Edison boosts operational efficiency with Fulcrum
"There are always new programs we need to pilot, and it’s incredibly convenient to integrate them into Fulcrum without extensive development time. Fulcrum allows us to add new elements as standalone solutions."
Chuck Dykes, Project Manager
Southern California Edison