Customer Stories
Learn how some of our 50,000+ users across 100+ countries use Fulcrum to transform the way they work.
Featured

Owen Electric Cooperative: Accelerating pole inspection workflows with Fulcrum
"Before we were spending about three minutes per pole inspection. With Fulcrum, it takes 30 to 45 seconds — a time savings of at least 75% per pole."
Greg Humphries, Engineering Project Supervisor
Owen Electric Cooperative

TREKK Design Group, LLC: Innovative water utility inspections using Fulcrum, GIS and 3D imaging
“The Fulcrum/Esri integration is a game changer for our organization. It will dramatically improve current operations while also opening many additional use cases for TREKK and our clients.”
TREKK Design Group, LLC

Inspecting rail infrastructure networks & performing asset maintenance
The automated capturing of GPS location is helping us to realize new benefits to having location data stored in our system. We have closer integration with our GIS system, plan future works more efficiently, and conduct more creative, spatially aware analysis of information.
VicTrack



